Project:

REBUILDING OF THE HOTEL SAVOY

Owner:

Immobiliare Savoia S.r.l.

Client:

FE.BE. S.r.l. Costruzioni Edili

Project description:

The rebuilding of this historic hotel comprises of the construction of an underground multi-level parking. This required the realization of a 13m-deep excavation, for a total length of 195m, supported by a multi anchored sheet pile wall.

Geologic context:

Sanremo flysch formation (shales with thin layers of sandstone) characterized by different weathering degrees function of depth. Colluvial and/or recent deposits cover the flysch bedrock.

Location:

Sanremo (Italy)

Start/end date:

-

Cost estimate:

-

Design and consultancy services:

Verification of the stability of the retaining wall: geotechnical characterization and analysis with respect to the structural adequacy and overall stability of the retaining wall. The analysis and monitoring recommendations were based on Eurocodes and Italian norms.

Period:

2002

In collaboration with:

PM&E S.r.l.

A&K Geotechnical Engineering | Via Mentana 9/B, Turin I-10133 | tel/fax +39 011 6603050, e-mail info@a-k.it

Home _ Project sheets _ Fields of activity _ About us