Project: |
REBUILDING OF THE HOTEL SAVOY |
||||
Owner: |
Immobiliare Savoia S.r.l. |
||||
Client: |
FE.BE. S.r.l. Costruzioni Edili |
||||
Project description: |
The rebuilding of this historic hotel comprises of the construction of an underground multi-level parking. This required the realization of a 13m-deep excavation, for a total length of 195m, supported by a multi anchored sheet pile wall. |
Geologic context: |
Sanremo flysch formation (shales with thin layers of sandstone) characterized by different weathering degrees function of depth. Colluvial and/or recent deposits cover the flysch bedrock. |
||
Location: |
Sanremo (Italy) |
Start/end date: |
- |
Cost estimate: |
- |
Design and consultancy services: |
Verification of the stability of the retaining wall: geotechnical characterization and analysis with respect to the structural adequacy and overall stability of the retaining wall. The analysis and monitoring recommendations were based on Eurocodes and Italian norms. |
||||
Period: |
2002 |
In collaboration with: |
PM&E S.r.l. |
![]() |
|||||
A&K Geotechnical Engineering | Via Mentana 9/B, Turin I-10133 | tel/fax +39 011 6603050, e-mail info@a-k.it |
|||||