Project:

RIO TAQUESI HYDROELECTRIC PROJECT

Owner:

Hidroeléctrica Boliviana S.A.

Client:

Consorcio Astaldi - CBI / SEA Consulting Srl

Project description:

85.67MW hydroelectric project along the Taquesi and Unduavi Rivers consisting of two cascade plants: the Chojlla and the Yanacachi. A total of 7km of diversion tunnels (width: 2.4m height: 3m), excavated by conventional means.

Geologic context:

Tunnels are excavated principally through metapelites. Good rock classes prevail (65%), very high inflows and overbreak in the poorer rock classes as defined by the highly fractured and weathering conditions.

Location:

La Paz (Bolivia)

Start/end date:

2000-2002

Cost estimate:

97.5M$

Design and consultancy services:

Diversion tunnels Chojlla and Yanacachi - technical review of the dispute on grouting: analysis of Project documents (specs and correspondence between the Concorcio and Black & Veatch - Colenco Power Engineering JV), comparison with technical literature on grouting, technical assessment of the need for grouting independent of contractual documents.

Period:

2002

In collaboration with:

SEA Consulting S.r.l.